Project Name:

Utilities, Infrastructure, Capital Renewal

Project Priority:

Ongoing

Project Description:

This line item includes but is not limited to a 2000-ton chiller,
telecommunications infrastructure, the widening
of Gemini Boulevard East and and Orion Boulevard, and the
realignment of Gemini Boulevard.

Project Funding:

Ongoing (Amount to be determined)
Gross Square Feet: N/A
Net Square Feet: N/A

 

 

   

Funding Source:

PECO

 

 

Included on 1996 Campus Development Agreement:

Yes

 

 

             
             
             
             

Project Name:

Recreational Services Facility

Project Priority:

#1

Project Description:

The Recreational Services Facility, located adjacent to the existing Recreational Service Building, will include expanded fitness services such as a wellness center, refreshment bar and indoor track.

Project Funding:

1998 - 2002

 

 

Planning

 

$802,494.00

 

Construction

$14,183,362.50

 

Equipment

$294,595.00

 

Total Project Cost

$15,280,451.50

 

Gross Square Feet:

84,794

 

 

Net Square Feet:

60,817

 

Funding Source:

PECO,Match

 

 

Included on 1996 Campus Development Agreement:

Yes

 

 

             


 

Project Name:

Multilingual Multicultural Center

Project Priority:

#2

Project Description:

The Multilingual Multicultural Center, a joint-use project with the Office of International Studies & Center for Multilingual/Multicultural Studies, will house classrooms and offices focusing foreign language instruction.  The facility will allow for the co-location of the Department of Foreign Languages and the Center of Continuing Education.

Project Funding:

1999 - 2001

 

 

Planning

 

$350,000.00

 

Construction

$2,238,138.00

 

Equipment

$164,585.00

 

Total Project Cost

$2,752,723.00

 

Gross Square Feet:

16,285

 

 

Net Square Feet:

10,870

 

Funding Source:

Private,Match

 

 

Included on 1996 Campus Development Agreement:

Yes

 

 

             


 

Project Name:

Wastewater Treatment Expansion

Project Priority:

#3

Project Description:

The Wastewater Plant Expansion purpose is to purchase an additional 1,000,000 MGD of waste water capacity for the University from Seminole County.  The Iron Bridge Plant will receive the additional wastewater discharge.

Project Funding:

2002 - 2005

 

 

Planning

 

 

 

Construction

$4,950,000.00

 

Equipment

 

 

Total Project Cost

$4,950,000.00

 

Gross Square Feet:

 

 

 

Net Square Feet:

   0

 

Funding Source:

PECO

 

 

Included on 1996 Campus Development Agreement:

No

 

 

             


 

Project Name:

Engineering Bldg. II

Project Priority:

#4

Project Description:

The Engineering Bldg. II, the second of three phases, will house faculty offices and research labs for three departments.  This facility will be located adjacent to the existing Engineering Building.

Project Funding:

1998 - 2001

 

 

Planning

 

$1,124,305.00

 

Construction

$15,125,695.00

 

Equipment

$2,202,472.00

 

Total Project Cost

$18,452,472.00

 

Gross Square Feet:

101,452

 

 

Net Square Feet:

65,382

 

Funding Source:

PECO

 

 

Included on 1996 Campus Development Agreement:

Yes

 

 

             


 

Project Name:

Health & Public Affairs II

Project Priority:

#5

Project Description:

The Health & Public Affairs II building, the second of two phases, will house office space and teaching labs for Micro/Molecular Biology, Communicative Disorders, and Health Professions.  The facility will be located adjacent to the existing Health and Public Affairs Building.

Project Funding:

1998 - 2001

 

 

Planning

 

$900,000.00

 

Construction

$8,400,000.00

 

Equipment

$1,125,000.00

 

Total Project Cost

$10,425,000.00

 

Gross Square Feet:

61,904

 

 

Net Square Feet:

41,269

 

Funding Source:

PECO

 

 

Included on 1996 Campus Development Agreement:

Yes

 

 

             


 

Project Name:

Honors Center

Project Priority:

#6

Project Description:

The Honors Center will include Academic classrooms, media/reading room, computer lab, and office space for the Honors  College.  The facility will be located north of the campus bookstore.

Project Funding:

1999 - 2000

 

 

Planning

 

$323,801.00

 

Construction

$2,373,044.00

 

Equipment

$263,155.00

 

Total Project Cost

$2,960,000.00

 

Gross Square Feet:

15,375

 

 

Net Square Feet:

10,250

 

Funding Source:

PECO,Match

 

 

Included on 1996 Campus Development Agreement:

Yes

 

 

             


 

Project Name:

Center for Public Safety / Security

Project Priority:

#7

Project Description:

Also known as Partnership I, this project is a  joint venture with the Navy, Forensic Science and Public Safety.  This project consists of labs, offices and support spaces and will be located on Research Park land donated for use by these groups.

Project Funding:

1998 - 1999

 

 

Planning

 

 

 

Construction

$9,084,000.00

 

Equipment

 

 

Total Project Cost

$9,084,000.00

 

Gross Square Feet:

67,688

 

 

Net Square Feet:

45,205

 

Funding Source:

PECO

 

 

Included on 1996 Campus Development Agreement:

No

 

 

             


 

Project Name:

Bio-Science Field Station Facility

Project Priority:

#8

Project Description:

Facility to house departments hazardous supplies. Located off WWTP Road (SE corner of Main campus). Confirm NASF information.

Project Funding:

1998 - 1999

 

 

Planning

 

$462,000.00

 

Construction

 

 

Equipment

 

 

Total Project Cost

$462,000.00

 

Gross Square Feet:

8,000

 

 

Net Square Feet:

7,606

 

Funding Source:

UCF

 

 

Included on 1996 Campus Development Agreement:

No

 

 

             


 

 


 

Project Name:

Academic Villages

Project Priority:

#9

Project Description:

The Academic Villages consists of multiple clusters of student housing, including residence halls and apartment buildings located in the southern part of campus.

Project Funding:

1999 - 2000

 

 

Planning

 

$2,850,592.00

 

Construction

$50,247,315.00

 

Equipment

$2,978,648.00

 

Total Project Cost

$62,919,313.00

 

Gross Square Feet:

493,438

 

 

Net Square Feet:

352,113