Selection Results
Shortlist Results
Final Results
- AMI Utility Network and Grid Metering
- UES Electrical
- Electrical Contractor Continuing Services
- Stormwater Continuing Services
- UCF-601 Performing Arts Complex Phase II – CM
- MEP/FP Continuing Services
- Roofing Contractor Continuing Services
- UCF-601 Performing Arts Complex Phase II
- Civil Engineering Continuing Services
- UCF-599 Chemistry Building Renovation – CM
- UCF-599 Chemistry Building – Engineer
- Industrial Rotating Equipment (Motors & Pumps)
- Wastewater Continuing Services
- Building Envelope Continuing Services
- UCF-597 Biological Sciences Renovation CM
- Mechanical Contractor – Continuing Service $4M
- General Contractor – Construction Management $4M Continuing Service
- UCF-597 Biological Sciences Renovation
- Architect
- Industrial and Mechanical Wet Piping
- Utility Metering
- Medium Voltage Electrical Services and Control Circuitry $2M
- Fire Alarm
- Tree Care Contractor Continuing Services
- Structural Engineering Services
- Roofing Contractor Continuing Services
- Electrical Contractor Continuing Services
- Threshold Inspection Services
- GC $500K Continuing Services
- Roth Athletic Center (WD77) (Construction Manager)
- Commissioning Professional Services
- Test and Balance
- Emergency Response Contractor
Bid Results