Classroom Building 2 Stair Replacement

Start Date: May 2025
Target End Date: August 2025
Status: Construction in progress

 

PDC will be replacing all the paved steps around the exterior of Classroom Building 2.

 

The project will be done in two phases, with the first phase consisting of upgrades to the red steps that open to Classroom Building 1. Existing ramps can be utilized to allow pedestrian access to the building.

 

Once replacement of the red steps is complete, work will begin on the white steps that open to Memory Mall. Existing ramps can be utilized to allow pedestrian access to the building.

 

The entire project is expected to be completed in August, however, construction timelines are subject to change.

 

The stairs and their surrounding areas will be closed during their respective phases of construction. Please adhere to all signage as you move throughout the building. Thank you for your patience during this project.

 